What was the budget for the Tacoma Narrows Bridge?
What was the budget for the Tacoma Narrows Bridge?
$6.4 million
The bridge cost $6.4 million; tolls started at 55 cents and were cut to 50 cents two months later when the bonds were refinanced. It’s been more than six decades since the first Narrows Bridge opened to traffic and then, four months later, collapsed violently into Puget Sound.
Who was responsible for the Tacoma bridge collapse?
The Board refused to blame any one person. The entire engineering profession was responsible, said the experts. They exonerated Leon Moisseiff. However, after November 7, 1940, his services were not in high demand.
Was the Tacoma Narrows Bridge insured?
[Enlarge image] Bank checks made out to the Washington Toll Bridge Authority covering the insured loss on the Tacoma Narrows Bridge, April 1941. Seattle Post-Intelligencer Collection, PI- 20804.
Is Narrows Bridge paid?
Tolls for the Narrows Bridge increased by about 25 cents in October, following approval from the Washington State Transportation Commission. Eastbound drivers who have a Good To Go! pass now pay $5.25 to use the Tacoma Narrows Bridge. People paying with cash or card at the toll booth pay $6.25 per trip.
Is the new Narrows Bridge paid off?
According to Randall, the bridge’s $729 million construction costs will end up being closer to $1.48 billion, which would be paid off by June 30, 2030.
Is the Narrows Bridge paid off?
The bill transfers $3.25 million from the general fund each quarter, $130 million total, to help pay for the bridge until July 2032.
What caused Tacoma Narrows Bridge collapse?
The Tacoma Narrows Bridge collapsed primarily due to the aeroelastic flutter. In ordinary bridge design, the wind is allowed to pass through the structure by incorporating trusses. In contrast, in the case of the Tacoma Narrows Bridge, it was forced to move above and below the structure, leading to flow separation.
What caused the Tacoma bridge collapse?