How much does it cost to fix the floor under a toilet?

Average Subfloor Replacement and Installation Cost*

Average Cost $550
High Cost $720
Low Cost $500

Can you replace bathroom floor without removing toilet?

They often ask if they should remove the toilet before installing a new bathroom floor. While it is possible to install a new linoleum or ceramic tile floor without removing the toilet, it is not recommended and actually can increase the labor involved in the project.

How do you reinforce subfloor from below?

The best way to strengthen floor joists from underneath is to make a supporting mid-span beam or wall beneath the wobbling joists. Using jack posts or 6×6 posts and 2×10 or 2×8 beams perpendicular to the joists will solve any wobble and ensure your joists never move again.

How much does it cost to replace a subfloor in a bathroom?

On average, replacing an entire subfloor in a 300-square-foot room can cost between $450 – $2,000….Average Cost to Replace a Subfloor. (300 sq. ft)

Item DIY Professional
Total $483 $658

Do you have to remove toilet to install flooring?

Installing new bathroom flooring requires removal of the toilet. This will allow you to remove the old flooring and properly reseat the toilet on top the new floor. Before removing the toilet, you will need to disconnect the water supply line, drain all the water and remove two nuts.

Does flooring go under toilet flange?

The toilet flange needs to be on top of the finished floor. Meaning the bottom edge of the flange needs to be on the same plane as the toilet. So if your toilet sits on the tile, the flange needs to be on top of the tile too.

Is it better to tile under or around a toilet?

The bathroom fitters are unanimous—if you’re looking for a high quality finish, with a better seal against water damage, then always tile the floor first.

Does flooring go under toilet?

If you’re installing a new floor, pedestal sink, and toilet, you should install the laminate flooring first so it’s under the sink and toilet. Because laminate flooring floats above the sub-floor on top of underlayment, it will expand and contract slightly with the temperature and humidity of the room.

How much can you jack up a sagging floor?

It’s important not to jack your floor too fast. If you do, you can cause the wall above the area to crack. Instead, Jack your floor slowly. As a rule of thumb, you only want to raise your floor 1/8 of an inch a day.

How do I make my subfloor stronger?

Fix bouncy floors by adding bridging, adding a layer of plywood or adding a wall or beam. We’ll show you three ways to stiffen up your bouncy floor—by adding bridging, installing plywood along the joists and adding a wall or beam under the floor. Any one of the three can solve your problem, depending on your situation.

What is the best material for a bathroom subfloor?

plywood subfloor
Pressure treated 3/4″ plywood subfloor is the best subfloor material for bathrooms. Pressure treated plywood is water resistant and will withstand the humid, damp bathroom environment much better than untreated plywood or OSB.

Should flooring go under toilet flange?

Should toilet flange be on subfloor or finished floor?

The toilet flange needs to be on top of the finished floor. Meaning the bottom edge of the flange needs to be on the same plane as the toilet. So if your toilet sits on the tile, the flange needs to be on top of the tile too. The spacing of the toilet exit “horn” and sealing surface is designed for this height.

Do you install vinyl plank flooring under toilet?