How do I get planning permission for Barnet?

Apply online The quickest and easiest way for you to submit a planning application is online via the Planning Portal. You’ll find step-by-step advice for each type of application and form. You can save your work on the site and come back to it if you don’t have all of your information to hand.

How long is Barnet planning permission?

prior approval is required and given. the expiry of a period of no less than 42 days following the date on which the information was received by us and no written notification has been sent to the developer as to whether prior approval is given or refused.

Can I apply for planning permission before completion?

In short, yes. You do not need to be the owner of a property to apply for planning permission. However, you will need to inform the owner of the property/land prior to submitting the application.

Has planning permission been extended?

Permissions extended Under section 93A of the Town and Country Planning Act 1990, unimplemented planning permissions with time limits for implementation which were due to lapse between 19 August 2020 (when the provisions came into force) and 31 December 2020 are extended to 1 May 2021.

Do you need planning permission for 3 meter extension?

Extensions of more than one storey must not extend beyond the rear wall of the original house by more than three metres. Anything more than three metres and you would require planning permission for the extension. The maximum eaves and ridge height of your extension must be no higher than the existing house.

What can you object to on a planning application?

What is a valid objection to a planning application

  • Loss of light or overshadowing.
  • Overlooking/loss of privacy.
  • Visual amenity (but not loss of private view)
  • Adequacy of parking/loading/turning.
  • Highway safety.
  • Traffic generation.
  • Noise and disturbance resulting from use.
  • Hazardous materials.

What drawings do you need for a planning application?

The plans, questionnaire and ownership certificate will be required, three types of plan drawings are required:

  • The location plan.
  • The Block Plan (sometimes referred to a the site plan)
  • The floor plans and elevation.