The Commissioning Process: A Step-by-Step Guide

  1. Step 1 – Planning. There are several activities that take place off-site prior to the commissioning team mobilizing to site during the design and construction phases of a project.
  2. Step 2 – Factory Acceptance Testing.
  3. Step 3 – Mechanical Completion.

What comes first testing or commissioning?

Upon completion of static testing, dynamic testing can be undertaken, this is ‘commissioning’. Commissioning is carried out to prove that the systems operate and perform to the design intent and specification.

What does commissioning protocol mean?

Commissioning Protocol means the protocol that ensures that technical and operational information meets the principles detailed at Schedule I – Particulars of Vessel and Schedule V – Minimum Test Requirements and allows the Vessel to be delivered in FSRU Mode and shall include, in reasonable detail, technical and …

What is a commissioning statement?

A Testing and Commissioning Method Statement is a written document that details clear and concise steps, for completing a particular element of work.

What is commissioning Validation?

Commissioning ensures that facilities, systems and equipment are designed and installed as specified and function as intended. Qualification ensures equipment and systems function to produce products correctly. Validation ensures that the final product is built correctly.

What is good commissioning?

Person-centred and focuses on outcomes – Good commissioning is person-centred and focuses on the outcomes that people say matter most to them. It empowers people to have choice and control in their lives, and over their care and support.

What are the details that must be included in the complete commissioning reports?

Commissioning report contents should be clearly defined in commissioning plans and include an executive summary, a narrative of the commissioning process and Cx process results.